News

Epiflex Specified At Victoria Station, London

Further to successful and long-lasting installations of ironwork with Epiflex on the A69, Transport for London specified the material for this channel drain reinstatement. One advantage of using Epiflex is that it may be poured into wide or narrow gaps (as in this case), either side of channel drain. And a far superior performance of this transition strip is achieved, compared to a gap filled with 150mm of high-strength concrete. The material develops high bond strengths to asphalt, concrete and metal, allowing even-distribution of dynamic stress loading.

victoria station

news button prev
news button next
Sign up for the latest news, products and more!!!

The information you have provided us will help us deliver information you regarding our products and services. By checking this box indicates that you have read and agreed to our terms of use and privacy policy. Please read these terms to understand how we protect and manage your data.

Head Office

  • Kingston House
  • 3 Walton Road
  • Pattinson North
  • Washington
  • Tyne & Wear
  • NE38 8QA
  • United Kingdom

Connect with us